GRIT-Solid Driveway with Cold Tar & Grit


Previously, a product from Rock Solid Floors was used, but failed on 5 different jobs. We decided to compare an in-house coating developed based on research of similar products. Our product proved most desirable in regards to both effectiveness and cost. One customer named Chuck had the opportunity to experience both products and you can find his contact information on the reference page.





Cost

Grit-Solid: $2 / sqft (includes 5 year warranty)


You do not need to seal this product every again, but we do recommend it every 5 years.  It will have the grit last longer on your driveway. 

 

Customer must power wash the driveway prior to service being completed.  We charge $.10 sq foot ($250 minimum) which included chemical removal soviets.  Oil spots and dirt the Grit will not adhered to.  



Some sections of your driveway project may need additional assistance in bringing the driveway up to code for this procedure, each case is different and will require an estimate. 


Due to material limitations, projects under 800 sqft are priced at $3.00/sqft


Weather Conditions

For this service, the ideal seasons are during the spring and fall. The project can be completed in the summer months after 7pm and occasionally overnight. The direct sunlight will dry the adhesive so quick that the grit will not take hold.


Post-Completion Guidelines

Please wait

1. 48 hours before walking

2. 7 days before using a wheeled object on the surface

3. 30 days before parking


Project-Specific Warranty

5 year warranty without primer, 10 year warranty with primer. Failure to comply with Post-Completion Guidelines will result in a voided warranty. Some companies will void the warranty if a sealant is applied. Our warranty will stay active if our company provides the sealing service.

Note: The grit used contains 2% sand which will sparkle in sunlight. If this is an undesirable characteristic, please read more about our color sealing services.  Must wait one full year before sealing this product.


Procedure

1. Prep the driveway so that all cracks, holes ares are level (1 day)

2. Primer is applied (very sticky) must dry for 12-24 hours (1 day)

3. SSH-1 & Grit application.  Working in section (1-2 days)

4. Hard sweep of lose grit and correct any areas missed (1 day)

5. Blow all loose grit off driveway (1 day )  Note: Sometimes 4 & 5 will be on the same day

6. Rope off and will leave yard sign for 30 days.  We will return to collect


I CANNOT STRESS THIS ENOUGH. IF THERE IS A PROBLEM, PER CONTRACT, YOU ARE REQUIRED TO NOTIFY US WITHIN 72 HOURS.  A SMALL PROBLEM STAYS SMALL IF THE REPAIR IS NOT PROLONGED.